2011
- May 28th Strong Track Repair
- May 28th Utterly Miscellaneous
- May 28th Holding Tank Issues
- May 28th Injector Nut
- May 28th Windlass handle
- May 15th Sail Maintenance
- April 5th Go sailing, stuff breaks
- April 4th Scuba Tank shelf
- April 2nd Sink issues
- April 1st Varnishing
- April 1st Rusted Stuff that go Replaced
- March 23rd Miscellaneous Engine Work
- March 17th Splash Panel for Engine Room Electronics
- March 15th Refrigeration
- March 14th Running Rigging Maintenance
- March 9th Exhaust Manifold
- February 28th Auto Pilot Maintenance
- January 19th Wind Generator tie-off
- January 17th Plinths
- January 17th Various Electrical Jobs
- December 20th Sealant jobs
- May 25th Repaired boom vang
- March 3rd Repaired Monitor Windvane
- February 27th Serviced Watermaker
- February 8th Repaired SSB (all Pete)
- February 3rd Added lightning protection
- February 3rd Added restraining netting to liquor cabinet
- February 3rd Installed new (to us) radar
- February 3rd Added second primary fuel filter
- February 3rd Redid SSB counterpoise
- February 3rd Fabricated Quadrant Blocker
- February 3rd Serviced Windlass
- February 1st Fabricated electronics control tower for radar arch
- January 27th Replaced chainplates, added plinths
- January 19th Built storage shelves for icebox
- January 15th knees (part 3)
- January 15th Replaced primary anchor
- December 28th First knee reglassed (Knees Part 2)
- December 21st Knees Broken (Part 1)
- December 1st Refinished Deck
- November 2nd Refinished wood on deck (scrape, sand, varnish)
- November 1st Added solar panels to the arch
- October 25th Installed KISS wind generator
- October 25th Fabricated new arch for radar, solar, wind generator
- October 25th Replaced Heat Exchanger; FIXED ENGINE OVERHEATING
- October 25th Replaced seawater faucet (again)
- October 23rd Installed Battery Monitor
- October 5th Our first weeping blister
- September 21st Can anyone identify this windlass?
- September 15th Replaced engine water temperature gauge and sender
- September 14th Tried to repair delamination; made a mess
- September 8th Replaced cam in seawater pump
- September 8th Refrigeration, pt 5 (FINAL)
- September 8th Replaced batteries in house bank
- September 8th Installed echo charger
- September 8th discovered lumps
- August 31st repaired jib sheet foot blocks
- August 31st latest engine overheating frustrations
- August 1st Moved Propane Locker, Added Lazarette
- July 30th Refrigeration, pt4
- June 16th Refrigeration, pt 3
- June 1st Installed Oil Transfer Pump
- June 1st Added amidships cleat
- May 17th more engine overheating problems
- May 15th Refrigeration, pt 1
- May 8th Rebedded Staysail Tracks
- April 22nd Found, fixed three diesel leaks
- March 26th Cleaned heat exchanger (soaked in acid)
- March 26th Sanded sole board edges, epoxied
- March 18th Fabricated battery covers
- March 18th Installed carbon monoxide detector
- March 18th Installed storage shelves in wet locker
- March 18th Rebedded Dorade Boxes
- March 18th Rebedded pushpit & aft cleats
- March 18th Added reflective tape to the mast
- March 18th Serviced tow generator
- March 18th Expanded port settee bed
- March 18th Added second foot pump for seawater
- March 18th Modified salon table
- March 2nd Added 4 fixed portlights
- January 17th Mounted mirror aft of engine
- January 17th Added/replaced spinnaker hardware on deck
- January 17th Rebedded stanchions and bow pulpit
- January 17th Replaced water pump
- January 14th Compression tested engine
- January 14th Fabricated gasket for dinghy gas tank
- January 14th Caulked companionway with 4200 UV
- January 14th Replace raw water intake hoses
- January 14th Adjusted valve clearances
- January 14th Replaced engine key switch and push button
- January 14th Rebuilt engine injectors
- January 14th Rebuilt Monitor Windvane
- January 14th Remounted diesel heater
- January 14th Replaced zincs in heat exchanger
- January 6th Refinished rubrail
- January 6th Moved liferaft cradle & installed dinghy cradle
- December 6th Replaced thermostat housing gasket
- December 6th Rebuilt/Rewired Main Electrical Panel
- December 6th Installed GFCI electrical outlets
- November 24th New Marine Electrical Paradigm
- November 24th long hiatus . . .
- August 20th Replaced jib turning blocks
- August 16th Redid mainsheet rigging
- August 15th Installed Custom Mast Steps
- August 15th Serviced Winches
- August 15th Replaced rope clutches and deck fairleads
- July 15th Replacing Watertanks, Pt 2
- July 15th Replaced jib, staysail sheets
- July 15th Replaced reef hook
- July 15th Replaced docklines, bumpers
- July 15th Added dedicated starting battery
- June 23rd Replaced bilge hoses & scupper lines
- June 23rd Replaced stereo & speakers
- June 23rd Replaced VHF coax
- June 23rd Cleaned, Painted Bilge
- June 23rd Replaced Lifelines
- May 30th Repainted bottom
- May 29th Rewired mast
- May 29th Replaced bow pulpit backing plates
- May 29th Replaced standing rigging
- May 29th Redid underwater zinc installation
- May 29th Replaced masthead trilight, LED bulb
- May 6th Repaired delaminated rudder
- May 6th Repaired keel damage
- April 30th Replaced Propane Locker Drain
- April 30th Serviced manual bilge pumps
- February 17th Replacing Watertanks, Pt I (removal)
- January 25th Assembled new jacklines & tethers
- December 12th Serviced Packing Gland
- September 1st First Pictures, pre-purchase