Other completely Random Shit
I (Jon) finished these jobs variously between November and April.
I replaced the o-rings on all the deck-fills.
I painted the leading edge of the dodger where the paint was peeling.
I replaced the lines that held the rigging for the whisker pole with beefier line.
I added distilled water to the batteries.
I adjusted the bridle for the outboard engine.
I replaced the ethernet cord with a longer one.
I serviced and cleaned up the valve for the propane line to the BBQ. I also bought a new valve. It doesn’t fit the line. Fuck me.
I added another line to keep the fenders in place in the engine room.
I replaced the fuse for the wind generator when it blew because I was messing with the wiring when adding the splash panel.
A board on the dinghy that sits behind the mount for the engine came off. It seems to have been held on by a single nail. Justin put it back on with 4 wood screws.
Justin broke the bungee line that holds the monitor servo paddle out of the water while it is not being used. It got replaced. The bungee line, not Justin.
I replaced a spring on one of the hatches that broke.
I put a patch on the dinghy to try and stop a leak in one of the corners. Matt declares that it will forever leak, but I believe it can be stopped. The patch I applied is about 99% effective, so I’m at least glad for that.
Leave a Reply