Refinished wood on deck (scrape, sand, varnish)

. . . including dorade boxes, the hatch surrounds, cockpit coaming, and the caprail.  Jonny did this job.  I wish I had more pictures of the finished result, somehow forgot about that one.

Jonny did 4 coats on each surface.  First coat was thinned 50% to penetrate, second coat was thinned 25%, all coats after that were un-thinned.  Varnish used was the Epifanes high-gloss.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *