Refrigeration, pt4

Pt 1
Pt 2
Pt 3

Built a platform and mounted the compressor, and built/faired the lid for the box.  Glued down formica laminate, then painted with two coats of Primekote, sanding in between.  Almost finished, just have to put on the two coats of Interlux Perfection, mount a ring pull in the lid, then seal down the hinges and run a bead of caulk around the countertop.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *